• Formal Safety Assessments for first planned shoreside Floating LNG export facility to be located in Port Lavaca, Texas.
  • Facilitated BP HAZIDs in real time for Capping Stack, Well Kill and Static Kill operations on Macondo 252 (Deepwater Horizon)
  • Cabrillo Port Independent Risk Assessment – first use of Computational Fluid Dynamics software for LNG facility regulatory submittal in the US
  • Calypso Port Independent Risk Assessment – developed methods and procedures for first use of Automatic Identification System (AIS) data in ship collision risk assessment for a US offshore port
  • Facilitated Comparative Risk Assessment for Deepwater Production Systems enabling the MMS to write a record of decision pertaining to allowing Floating Production Storage and Offloading systems in US waters
  • Advisor to Chevron in their Riskman 2 Program
  • First QRA for BP Exploration USA and all BP Offshore Risk Tolerability Assessments